Try KYP
Explore a demo project, then try four modules on demo data. No sign-up needed.
- Multilingual coverage
- Checked against official registries and grid data
- Built only for renewable deals
Top findings
- CriticalMRA RevB · p. 2
- CriticalMRA RevB · p. 5 · IT
- HighMRA RevB · p. 5 · IT
- HighMRA RevB · p. 3
Checks
- Market data linkedIT-SUD zone, dated daily
- Requirements checklistItaly · solar · development
- Capacity 50 MWNo Italian registry wired in yet: marked unverified
- Grid permit expiredSince you were here · 18 Oct 2026
Risk by category
- Grid connection2 critical
- Permits1 critical
- Legal and land1 critical
- Energy yield2 high
- Commercial2 low
Why the score is capped
49/100
The score cannot rise above 49 while 4 critical findings are open. Close them, or have them waived by a manager, to lift the cap.
“A grid connection agreement has not been executed. Only the TSO connection quote (STMG) issued by Terna was provided to us.”
MRA RevB · p. 2“In assenza di accettazione entro il termine di validità, il preventivo decade e la richiesta di connessione dovrà essere ripresentata.”
MRA RevB · p. 5 · IT“Le opere di rete per la connessione comprendono il rinforzo della linea a 150 kV esistente, con tempi di realizzazione stimati in 36 mesi.”
MRA RevB · p. 5 · IT“The P90 (1-year) energy yield is 11.0% below the P50 estimate. Lenders should size debt against the P90 (1-year) case.”
MRA RevB · p. 3“No operation and maintenance contract was provided for review.”
MRA RevB · p. 3“Not found in the data room. Requested from the seller.”
Requirements checklist · Italy
Data room by discipline
- Technical9 / 10
- Legal8 / 9
- Environmental5 / 5
- Financial5 / 5
Missing documents
- O&M contractTechnical · requested from the seller
- Incentive conventionLegal · requested from the seller
Cost breakdown, €/MWh
- Capital and return€32.2
- Operations€11.3
- Tax€4.8
Assumptions
A demo project in KYP. Click any card or finding to explore it.
Try it
Try four modules on demo data
Pick a module and use it. Everything below runs on KYP's demo projects.
Ask about Project Helios. I answer only from its data room, and cite the page for every statement.
Finding, in English
Sample passages, one per language, all answering one check: is the grid connection contract signed? The quote stays in the original language; the finding is written in English.
Pick a project and run the check.
Debt 70% at 5.5% · 25-year life · straight-line tax depreciation from the country pack. Capacity factor starts at a typical value for the country. Example inputs, not market benchmarks.
Levelized cost of energy
–/MWh
- Capital and return
- Operations
- Tax
- Tax
- Effective rate
- After-tax WACC
- Depreciation
A simplified version of KYP's cost-of-energy model, which follows NREL's CREST method and adds debt sizing, reserves and tax credits.